Premier House

UK

Case Study Overview

Project Name: Premier House

Project Type: Residential

Products: Foil Underfloor Heating, Insulation

Premier House is a 1960‘s concrete frame office building which was converted into 119 luxury residential apartments. The development had 13 floors so the specified products within the floor build-up had to have strong acoustic sound reduction properties as well as a minimal height build-up.

The client was originally considering a wet underfloor heating system but was having difficulties in finding one which allowed for minimal height build up. So, in we stepped and proposed the ThermoSphere Foil electric underfloor heating system as a low build up alternative.

This solution was a completely dry installation and had a build-up of only 47mm. This meant that the client could maintain perfect room heights no matter the constraints of the structure. Importantly the acoustic improvement surpassed the building requirements required by building control.

We were able to provide a complete, fast-track solution, to an extremely tight deadline. We went above and beyond the requirements to supply a total floor buildup tighter than originally planned saving the client valuable time and resources.

permier-houe-bathroom
 

Ready to discuss your next project?

Let's grab a coffee and set your project in motion.

 

book a chat